Showing posts with label lounge. Show all posts
Showing posts with label lounge. Show all posts

Monday, August 11, 2008

Bar & Recreation Walls

After reception walls were done we started with the bar and recreation area with their shared toilet facilities (restaurant & lounge have their own as well). These buildings have large windows and around the front will have many wooden full-length louvred doors opening to a 2m wide wooden deck and the forest beyond. Part of the view from the bar and restaurant will include the large communal outdoor campfire area.

The bar/lounge lobby entrance from reception on the near right with 2 of the large windows of the bar visible to the centre.

The lobby between the bar and lounge seen here from the lounge in the foreground. The bar is beyond the the lobby.


View across the floor of the bar towards the recreation area. The wall on the left will form the back of the half-moon bar. From centre to the doors (visible in the right of the shot) is an 8m radius - this building will also have the highest roof with the centre post in excess of 12m high.


The location for the bar centre post visible in the foreground. Further across, the opening where full-length louvred 'shutter doors' will open to a 2m wooden deck.

Sunday, August 10, 2008

Bar, Lounge & Restaurant

During May the concrete slabs for the bar, lounge and restaurant were completed. In order to deal with the varying levels between sections and buildings as well as aesthetic purposes, the concrete was poured 'within' a perimeter of small shaped volcanic rocks. This then also hides the level of concrete from view when the buildings are seen from the outside as the walls will be erected inside but against the edge of this little rock perimeter.


The photos below show clearly how big the difference in levels between sections and buildings really is.



From foreground to back: edge of bar, lobby from reception, lounge, restaurant to far left and bathrooms serving restaurant and lounge to the far right.
Bar and recreation area (far left) - looking across to where the campfire area will be

Sunday, January 13, 2008

Photo Updates (2) - Foundation trenches

The trenches for reception, shop and bathrooms




Restaurant, Lounge and their bathrooms trenches dug and ready for foundations