The first 4x4 site we planted grass at. The cooking/fireplace incorporated into the rock in the foreground.
Showing posts with label 4x4 sites. Show all posts
Showing posts with label 4x4 sites. Show all posts
Sunday, August 10, 2008
4x4 Campsites - Update
Below are photos of 3 of the sites - taken about a month ago.
The first 4x4 site we planted grass at. The cooking/fireplace incorporated into the rock in the foreground.
The first 4x4 site we planted grass at. The cooking/fireplace incorporated into the rock in the foreground.Sunday, January 13, 2008
Photo Updates
Wednesday, July 25, 2007
4x4 Campsites B (11-26 April)
This particular 4x4 site has a stunning view of Mt Karisimbi from the dining area which is on area about 1.5m above the parking for this site. The campsite per se for this site is about 2m higher on the other side of the parking area.
View from the Dining Area
.JPG)
.JPG)
View of the parking area showing the high rocks on the left.
We've kept the rock walls covered in moss, lichen and vegetation here to retain the rustic look. This site in my opinion one of the nicest 4x4 sites.
.JPG)
A very large tree being removed to make space for the parking
In the left of the pic is the western leg of the 4x4 circular road going to the NW corner.
View from the Dining Area
View of the parking area showing the high rocks on the left.
We've kept the rock walls covered in moss, lichen and vegetation here to retain the rustic look. This site in my opinion one of the nicest 4x4 sites.
A very large tree being removed to make space for the parking
In the left of the pic is the western leg of the 4x4 circular road going to the NW corner.
4x4 Campsites A (11-26 April)
View of the site from its Parking
The parking has been constructed with volcanic rock similar to the rest of the roads on the site and each campsite will have its own dedicated parking spot..JPG)
The Clearing Team
The group of guys who cleared and levelled the site in 2 and a half days. This included removing all the existing vegetation and most of the buried rock except where they're standing where the fire place for cooking will be.
Planting Grass after clearing
Grass being planted which should be growing quite quick with all the rain we were having at this stage. The grass being planted around the rock where the fire place will be - so the rock plate will standing out from the grass where the tents can be pitched.
The parking has been constructed with volcanic rock similar to the rest of the roads on the site and each campsite will have its own dedicated parking spot.
The group of guys who cleared and levelled the site in 2 and a half days. This included removing all the existing vegetation and most of the buried rock except where they're standing where the fire place for cooking will be.
Grass being planted which should be growing quite quick with all the rain we were having at this stage. The grass being planted around the rock where the fire place will be - so the rock plate will standing out from the grass where the tents can be pitched.
Sunday, April 15, 2007
Pics of the roads
View south of the road leading down to the southern overland parkings and sites - about 10m from the main southern parkings.
View from Reception side, of the two northern overland parkings. (Mpisi walking around in the foreground)
Northern leg of the 4x4 circular road (looking west). 4x4 Parking and campsite planned about a third of the way on both sides of the road.Thursday, April 05, 2007
Roads and Campsites
Sarah and I have been spending some time around the site reviewing the progress that's been made with the roads and earmarking locations for the 4x4 and overland campsites.
The 4x4 circular road has been completed with the guys just finishing the final levelling with small pieces of rock rubble. The whole junction between the first two overland parkings have been completed with major progress being made on the road down to the southern parkings and sites.
The bar delivery road has also been completed. The plan is to make a 'ramp' from this road over the ridge between this road and the bar and a pathway with which deliveries can then be moved by a trolley to the bar store.
In the next 2 weeks I'll be taking a lot of photos showing the completed road sections and also the clearing and layout of the various campsites.
The 4x4 circular road has been completed with the guys just finishing the final levelling with small pieces of rock rubble. The whole junction between the first two overland parkings have been completed with major progress being made on the road down to the southern parkings and sites.
The bar delivery road has also been completed. The plan is to make a 'ramp' from this road over the ridge between this road and the bar and a pathway with which deliveries can then be moved by a trolley to the bar store.
In the next 2 weeks I'll be taking a lot of photos showing the completed road sections and also the clearing and layout of the various campsites.
Monday, February 12, 2007
4x4 Campsites: Circle road
Looking west, this junction is the South-east 'corner' of the circle road that leads around the 4x4 campsites.Sunday, February 11, 2007
The Past week reviewed
In addition to the excitement of our first foundations, work has been progressing very well. The "Ikoro Girls", the puppies, also had their next set of injections and two of them have left us today to Kigali. Akajama and Ingwe have settled in very well in their city home according to their new owner. Hopefully Mpisi and Imondo won't be missing their sisters too much. They will also now be going to the site with me everytime I go giving them and even bigger area to run around in but also more used to being in the car with me and being between people.
Andy and I have taken on another 20 employees on the site. 18 of them are masons which brings our number of masons on site to over 30. The total number of people working on the site is now 70! The enormity of the workforce hits home when one sees everyone setting off to their various workplaces on the site in the morning.
The pathways are proceeding quite rapidly as the guys are clearly into the swing of it with the masons knowing what we're expecting. Its becoming a more and more pleasing sight to see the pathways meander further and more widely through the site. Latest photos of the pathways in a follow-up post.
The roads are going very well with the 1st overland truck parking place completed. The second truck site has commenced which is quite a lot of work as there's a lot of filling up to do but the guys there are working hard with a high level of productivity.
The circle road around the 4x4 campsites is going very well too with a team that seem to outshine the rest in productivity with absolute ease.
In respect of the roads I'll also do separate posts to show some of the latest photos.
Andy and I have taken on another 20 employees on the site. 18 of them are masons which brings our number of masons on site to over 30. The total number of people working on the site is now 70! The enormity of the workforce hits home when one sees everyone setting off to their various workplaces on the site in the morning.
The pathways are proceeding quite rapidly as the guys are clearly into the swing of it with the masons knowing what we're expecting. Its becoming a more and more pleasing sight to see the pathways meander further and more widely through the site. Latest photos of the pathways in a follow-up post.
The roads are going very well with the 1st overland truck parking place completed. The second truck site has commenced which is quite a lot of work as there's a lot of filling up to do but the guys there are working hard with a high level of productivity.
The circle road around the 4x4 campsites is going very well too with a team that seem to outshine the rest in productivity with absolute ease.
In respect of the roads I'll also do separate posts to show some of the latest photos.
Subscribe to:
Posts (Atom)




a.jpg)
