After a lot of admin and meetings the past week, there is also some more good news from the site.
The second overland parking is also finished. Having been led by one of our new masons, this parking area looks brilliant and as level as anything. A lot of work has gone into this parking with, as mentioned before, tons of rock being used to fill up the area first. This was followed by a base layer of rock and finished off with a top layer of large rock compacted with soil again.
Looking at this spot before we started there shows how much work really had to be done. The front end of the parking had to be dug out, almost 1.5m deep. The centre hollow had large loose rocks that we then had to remove to see where our firm base is, this left a crater over 1m deep by 4m x4m.
For comparison, look at the pic in the previous post on 12 Feb showing the half-finished site. (I will post a photo of the finished product at a later stage)
Now follows the joining by rock of the entrance areas of Overland parkings #1 & 2 as well as the approach road from Reception. Every stage of this work now has to be monitored carefully as this is also from the road leads down to the southern-most two overland sites, which is also about 5m below the level of this section of road.
Thursday, February 15, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment