Sunday, April 15, 2007

Pics of the roads

View south of the road leading down to the southern overland parkings and sites - about 10m from the main southern parkings.


View from Reception side, of the two northern overland parkings. (Mpisi walking around in the foreground)


Northern leg of the 4x4 circular road (looking west). 4x4 Parking and campsite planned about a third of the way on both sides of the road.



Western leg of the 4x4 Circular road (looking North)A 4x4 campsite is planned just past the small banana tree midway up the road on the right.

Sunday, April 08, 2007

Before and After Review

These photos are of the bar delivery road which although short, took exceptionally long to clear due to amount of trees growing seemingly out of solid rock. The roots had found/created cracks and grown around the rocks.

View of the road (looking south) from where a ridge separates the road from the back of bar area. It took almost two weeks to remove one tree(People working furtherest from camera)that had been growing through cracks in massive slabs of rock


The Bar delivery road photographed toward the north after completion. The actual delivery ramp will start at the far right hand end of the road, angling over the ridge to back of bar.

Thursday, April 05, 2007

Roads and Campsites

Sarah and I have been spending some time around the site reviewing the progress that's been made with the roads and earmarking locations for the 4x4 and overland campsites.

The 4x4 circular road has been completed with the guys just finishing the final levelling with small pieces of rock rubble. The whole junction between the first two overland parkings have been completed with major progress being made on the road down to the southern parkings and sites.

The bar delivery road has also been completed. The plan is to make a 'ramp' from this road over the ridge between this road and the bar and a pathway with which deliveries can then be moved by a trolley to the bar store.

In the next 2 weeks I'll be taking a lot of photos showing the completed road sections and also the clearing and layout of the various campsites.