Yip, we got the last lot of iron sheetin today and the guys finished the roadside fence and then also finished the security hut. Although the hut is just a temporary shelter, the guys did a good job and it looks quite good. Also a handy bit of shade for the security guys in the day (not that there's a shortage of shade between all the trees. We used just over 200 iron sheets of about 90cm wide for the front fence - about 140meters!
The guys building the toilet are doing some serious rock busting with an iron stake being hammered in to crack the rock. By this afternoon they had gone about 1.7m deep - still all rock. Although this is very hard work its heartening to know that we can get through it with manual labour when we need to later on during construction.
The back of house/workshop boys got themselves some seriously large stumps, two of them about a meter in diameter! Add to that the now all to well-known root enveloped rock and you have a task of note at hand.
One of the other teams kicked off today on the road going to the 4x4 sites and seem quite happy that I'm not just making it straight but winding through contours and very large trees, so progressing there quite well.
Also had to exchange some dollars for local currency today - the exchange rate is all over the shop now due to the USD moving so much (mostly down though).